Dangerous waste

The stench coming from the room is nauseating. Its not the typical smell of rotting cabbage leaves or chicken intestines. It’s …

Containerized Incinerators

Model CA50 Feed Capacity Average 60 kgs per feed Burning Rate Average 70 kgs per hour Burning Time per Feed 1 …

Incinerators in Fiji

IT is a daily occurrence to see black smoke being emitted from the chimneys at the Colonial War Memorial Hospital in …

Burning Capacity 200 kg / hr Incinerators

Burning Capacity: 200 kg / hr Fuel to be used: Natural Gas M3/Oil Burn Rate: 45 Kgs/hr Minimum Operating Temp; 900 C Maximum Operating Temp. 1350 C Temp Monitoring / Thermostat Control / Constant Run Fan Loading system: Manual / Batch Type Control Panel dustproof , painted sheet with baked paint comprising: A circuit breaker switch for each motor ( fans and burners) .  A timer adjustable time delay for each burner control .  A regulator with a digital display for the combustion temperature .  A controller with digital display for temperature afterburner .  The electrical panel meets current standard. For removal of ash , a squeegee metal pan with handles The system must be quoted with electric panels We are looking for small incinerators with filter (with least minimum pollution) for burning/combusting 5kg/hr, 10kg/hr, 15 kg/hr, 20kg/hr, 25kg/hr to 50kg/hr and 300kg/hr of SOLID ORGANIC DRY AND WET NON-HAZARDUOUS of any kind (including hospital wastes) per day or per hour. Should it be with no smoke, no fumes, no odour (smell), no dust, no emission of solid particles and with least minimum pollution (within national and international standards). Must be environmentally healthy and acceptable with international standards. Should not be with water scrubbers. Ash contents after burning should be 3-4%. During the manufacturing and after packing, we generates some waste like, chicken bones, some fried products, vegetable waste, biscuits, chocolates (Paste), Plastics, foils, packaging materials, etc. We normally separate the organic waste to make compost. The restout need disposal. At present, we send it to landfill site. But We want to install an incinerator for such waste. The approx quantity is about 4 ton per day.   –  medical waste incinerator solutions and prices for 100 bed / 500 bed / 1000 bed / 3000 bed hospitals.                – Assumption: general hospital beds 50%, operation beds 50% for the 100 bed hospital case, while this ratio is 30-70% for the other cases    –  international standards and waste creations assumptions should apply

BRULEUR DE LA CHAMBRE DE POST COMBUSTION

Sont prévus 2 brûleurs du type à l’air soufflé au gasoil équipés  des dispositifs de sécurité.A la mise en route du four les deux  brûleurs sont  allumés pour assurer la température minimale d’au moins 1100°C ; ils restent en marche successivement  pour maintenir la température constante.Puissance thermique installée (290 + 350) KW.•    Installing a readymade concrete base (Precast) with Height 30 cm above the ground and 20 cm below the surface of the earth. •    The dimensions of the base are increased by (2 meters) from the edge of incinerators •    The rest of the accessories in all the trends even allows the worker directly feeding and maintenance work, cleaning and move easily taking into account the tendencies of the base toward the door for drainage of water.•    The floor coating must be high-quality epoxy paint.•    Install anti-rust and heat Umbrella of brick and steel (pyramid shape) of (5) meters height above the ground which installed with the edge of the concrete base by thick galvanized columns •    This umbrella Cover the site furnace and allow bringing the chimney8. CHEMINEE D’EVACUATION Constitué par un conduit métallique vertical de 8 m de long installée au-dessus de la  chambre de PC, diamètre 630 mm en tôle d’acier au carbone avec garnissage intérieur en réfractaire 9. ARMOIRE ELECTRIQUE DE COMMANDE ET REGULATIONComposée  de :Circuit  380 V- 50 HZ-3 phasesVoyant sous tensionCommande d’arrêt  généralVoyant état des bruleursAffichage des  températures  des deux chambresMinuterie des temps des cycles.Une variation des vitesses des ventilateurs Le tableau et les câblages sont prévus aux règles CEI avec protection IP 55Microprocesseur pour le contrôle et la régulation des températures, ainsi que les cycles d’opérationCâblages réalisés selon les règles CEI. 10. INSTRUMENTATION DE CONTROLE ET DE MESURAGE CONTINU  Les  dispositifs suivants  sont prévus : 1)Thermocouples pour la mesure de la température  en chambre de combustion  et postcombustion, à la sortie de l’échangeur dans la section d’entrée du filtre 2)Système de mesure de la concentration d’oxygène dans les fumées humides a la sortie de la chambre de postcombustion constitué de :Sonde de mesure de l’oxygène à l’oxyde de zirconiumPompe à la membranedébitmètre

General wastes incinerators

General wastes produced on a daily basis  include paper, plastic, organic materials, boxes, plastic containers, leaves, etc; Total waste produced per day: 10-12 tonnes; Hours of Operation: 10 hours a day; Fuel requirement: Diesel or waste oil preferred but LP gas will be considered; I also need a few some information on the installation i.e. spacing, building size, maintenance requirements, spare parts backing, PM inspections sheets, the number of employees required to operate the plant once operational etc.  Other necessary information include the benefits of using the incinerator system, operating costs, power consumption, operation, waste disposal, PPE requirements, safety information, environmental concerns if any, disadvantages if any, etc. I will like to know your best prices for Grate Combustion Incinerator of sizes of between 700 tons/day to 200 tons/day. Also, state other available incinerators available and the cost of all the accompanying equipment for installation. The incinerating system should have the capacity to supply electricity, less harmful, not so technical to enable semi skilled operators and a few skilled operators, environmentally friendly and also not so expensive to acquire and maintain.