blogs Archive

Incinerator Secondary chamber gas residence time

Secondary chamber gas residence time shall be minimum 1 second at 1050 oC.Primary Chamber:Type: Static Solid HearthMaterial of Construction: Mild Steel, 5mm thickRefractory thickness: approx.115mm thickMaterial: Refractory bricks confirming to international standard.Temperature resistance: 1400 oCInsulation thickness: approx.115mm thickMaterial: Insulation bricks confirming to international standard.Waste Charging: Manual & Automatic waste charging.Ash Removal: Manual/automaticSecondary Chamber:Type : Static Solid HearthMaterial of Construction: Mild Steel, 5mm thickRefractory thickness: approx.115mm thickMaterial: Refractory bricks confirming to international standard.Temperature resistance: 1400 oC.Insulation thickness: approx.115mmMaterial: Insulation bricks confirming to international standard.Waste Charging: Manual & Automatic waste charging.Emergency Stack:Type: cylindrical, top mounted on venturi ejector.Material of Construction: Mild Steel, 3mm thick.Refractory: 75mm thick castable.Insulation: 25mm thick castable.Quencher:Material of construction of outer body: Mild Steel refractory lined from inside.Shall have water circulation system with centrifugal pump.It shall have to reduce flue gas temperature before venturi scrubber.Shall provide pump motor of suitable capacity.Air Pollution Control Device C Venturi ScrubberType: High pressure jet type.MOC: Stainless steel C 316L.Temperature at the outlet: 78-80 oCScrubbing Media: Water with 5% causticRe- Circulation Pump for Venturi ScrubberType: CentrifugalApplication: PP/SSPiping : PPRDroplet Separator & Re-Circulation Tank (Integral)Type: CyclonicApplication: To separate water droplets from flue gasesMaterial of Construction: Mild Steel Rubber lined 3mm thickI.D. Fan:Type: High pressure centrifugalMaterial of Construction: Stainless steel 304, impeller and mild steel rubber lined castingDrive: BelCombustion Fan:Type: CentrifugalModulation: Manual damper controlMaterial of Construction: Mild SteelDrive: Direct drive

Equipment Specification for Children & Maternity Hospital Charsadda

Designed to burn disposables that can and should be destroyed on-site. Theses wastes include infectious and contaminated “red bag.” Surgical dressings, plastic test devices and other wastesFast, complete, efficient waste disposalDual chamber combustion, Chambers insulated and lined with high temperature refractory. Programmable digital temperature controls, temperature indicators and charge recorder. Modulating control for fuel and air lowers fuel consumption. Minimum installation and start up timeAluminized steel jacket lined with refractory and firebrick. Monitors recorders and other accessory equipment should be available. Charging system:• Vertical charge door on primary chamber.• Pneumatic or hydraulic ram charging system. • Auto shut down of the door after charging.• Primary and secondary chamber temperature displayed and recorded (optional)Charging rate:• Up to 100kgs per hour of waste or red bag waste rated at 2200 BTU’s per kg.Fuel:-  Natural GasCapacity (Cubic Mtr): 1.65M3 or moreAve Capacity: 100kg per hourSecondary Chamber Capacity (CubicMtr) :3.88 or moreLength (mm): 1880 or betterWidth (mm): 1280 or betterHeight Incl. Flue (mm): 7700 or betterAsh  Door Opening (mm): 475×900 or betterMin. Operating temperature: 90 degree centigradeMax, Operating Temperature: 1350 degree centigradeResidency time in Second Chamber: 2 secTemperature Monitoring: Both for primary and secondary chambers.Loading SystemManual/semi-automaticWaste destruction efficiency:> 90% by weight Filter: Ceramic or other equivalent filters in order to reduce the induction of hazardous air pollutants, particulates, co,dioxin/furane into the atmosphere.De ashing system: Manual/semi-automatic.The System must be quoted complete with:-• Plumbing• Electrical panels• Civil works• Waste collection Trolleys Finish/ Paint:-High Quality heat resistant, two layers high-grade epoxy Paint coating.Installed Power (Electric Voltage): 440V/ 50 Hz Waste Management Equipment must have ;Mobile loading trolley: 06 No’s – For transportation of hospital waste from wards to incinerator site/ room, Opening from the top.WASTE BINS MOBILE: 06 No’s-Made of Plastic, in blue color with a cover flap.Plastic Bags: 2000 no’s each in Red and Yellow color.Heavy Duty Gloves Pairs: For Waste handling staff-06 PairsLong Shoes Pairs: For waste handling – 06 Pairs.Make:  UK, Europe, USA, Japan

Burning Capacity 200 kg / hr Incinerators

Burning Capacity: 200 kg / hr Fuel to be used: Natural Gas M3/Oil Burn Rate: 45 Kgs/hr Minimum Operating Temp; 900 C Maximum Operating Temp. 1350 C Temp Monitoring / Thermostat Control / Constant Run Fan Loading system: Manual / Batch Type Control Panel dustproof , painted sheet with baked paint comprising: A circuit breaker switch for each motor ( fans and burners) .  A timer adjustable time delay for each burner control .  A regulator with a digital display for the combustion temperature .  A controller with digital display for temperature afterburner .  The electrical panel meets current standard. For removal of ash , a squeegee metal pan with handles The system must be quoted with electric panels We are looking for small incinerators with filter (with least minimum pollution) for burning/combusting 5kg/hr, 10kg/hr, 15 kg/hr, 20kg/hr, 25kg/hr to 50kg/hr and 300kg/hr of SOLID ORGANIC DRY AND WET NON-HAZARDUOUS of any kind (including hospital wastes) per day or per hour. Should it be with no smoke, no fumes, no odour (smell), no dust, no emission of solid particles and with least minimum pollution (within national and international standards). Must be environmentally healthy and acceptable with international standards. Should not be with water scrubbers. Ash contents after burning should be 3-4%. During the manufacturing and after packing, we generates some waste like, chicken bones, some fried products, vegetable waste, biscuits, chocolates (Paste), Plastics, foils, packaging materials, etc. We normally separate the organic waste to make compost. The restout need disposal. At present, we send it to landfill site. But We want to install an incinerator for such waste. The approx quantity is about 4 ton per day.   –  medical waste incinerator solutions and prices for 100 bed / 500 bed / 1000 bed / 3000 bed hospitals.                – Assumption: general hospital beds 50%, operation beds 50% for the 100 bed hospital case, while this ratio is 30-70% for the other cases    –  international standards and waste creations assumptions should apply

BRULEUR DE LA CHAMBRE DE POST COMBUSTION

Sont prévus 2 brûleurs du type à l’air soufflé au gasoil équipés  des dispositifs de sécurité.A la mise en route du four les deux  brûleurs sont  allumés pour assurer la température minimale d’au moins 1100°C ; ils restent en marche successivement  pour maintenir la température constante.Puissance thermique installée (290 + 350) KW.•    Installing a readymade concrete base (Precast) with Height 30 cm above the ground and 20 cm below the surface of the earth. •    The dimensions of the base are increased by (2 meters) from the edge of incinerators •    The rest of the accessories in all the trends even allows the worker directly feeding and maintenance work, cleaning and move easily taking into account the tendencies of the base toward the door for drainage of water.•    The floor coating must be high-quality epoxy paint.•    Install anti-rust and heat Umbrella of brick and steel (pyramid shape) of (5) meters height above the ground which installed with the edge of the concrete base by thick galvanized columns •    This umbrella Cover the site furnace and allow bringing the chimney8. CHEMINEE D’EVACUATION Constitué par un conduit métallique vertical de 8 m de long installée au-dessus de la  chambre de PC, diamètre 630 mm en tôle d’acier au carbone avec garnissage intérieur en réfractaire 9. ARMOIRE ELECTRIQUE DE COMMANDE ET REGULATIONComposée  de :Circuit  380 V- 50 HZ-3 phasesVoyant sous tensionCommande d’arrêt  généralVoyant état des bruleursAffichage des  températures  des deux chambresMinuterie des temps des cycles.Une variation des vitesses des ventilateurs Le tableau et les câblages sont prévus aux règles CEI avec protection IP 55Microprocesseur pour le contrôle et la régulation des températures, ainsi que les cycles d’opérationCâblages réalisés selon les règles CEI. 10. INSTRUMENTATION DE CONTROLE ET DE MESURAGE CONTINU  Les  dispositifs suivants  sont prévus : 1)Thermocouples pour la mesure de la température  en chambre de combustion  et postcombustion, à la sortie de l’échangeur dans la section d’entrée du filtre 2)Système de mesure de la concentration d’oxygène dans les fumées humides a la sortie de la chambre de postcombustion constitué de :Sonde de mesure de l’oxygène à l’oxyde de zirconiumPompe à la membranedébitmètre

Medical Waste Incinerators in South Africa

Medical Waste Incinerators in South Africa Market Overview and Demand Analysis South Africa, as the most developed country in Sub-Saharan Africa, faces ongoing challenges related to the safe and sustainable disposal of medical and hazardous healthcare waste. With over 400 public hospitals, …

General wastes incinerators

General wastes produced on a daily basis  include paper, plastic, organic materials, boxes, plastic containers, leaves, etc; Total waste produced per day: 10-12 tonnes; Hours of Operation: 10 hours a day; Fuel requirement: Diesel or waste oil preferred but LP gas will be considered; I also need a few some information on the installation i.e. spacing, building size, maintenance requirements, spare parts backing, PM inspections sheets, the number of employees required to operate the plant once operational etc.  Other necessary information include the benefits of using the incinerator system, operating costs, power consumption, operation, waste disposal, PPE requirements, safety information, environmental concerns if any, disadvantages if any, etc. I will like to know your best prices for Grate Combustion Incinerator of sizes of between 700 tons/day to 200 tons/day. Also, state other available incinerators available and the cost of all the accompanying equipment for installation. The incinerating system should have the capacity to supply electricity, less harmful, not so technical to enable semi skilled operators and a few skilled operators, environmentally friendly and also not so expensive to acquire and maintain.

Medical Incinerator for Kenya’s small-scale health facilities

Kenya’s small-scale health facilities—ranging from dispensaries and level‑2 clinics to level‑4 hospitals—are increasingly investing in on‑site medical waste incineration to safeguard public health and meet regulatory mandates.  1. Market Overview and Regulatory Context Kenya’s Health Care Waste Management (HCWM) Strategic Plan 2015–2020 …

Burning Capacity 200 kg / hr Incinerators

Burning Capacity: 200 kg / hr Fuel to be used: Natural Gas M3/Oil Burn Rate: 45 Kgs/hr Minimum Operating Temp; 900 C Maximum Operating Temp. 1350 C Temp Monitoring / Thermostat Control / Constant Run Fan Loading system: Manual / Batch Type Control Panel dustproof , painted sheet with baked paint comprising: A circuit breaker switch for each motor ( fans and burners) .  A timer adjustable time delay for each burner control .  A regulator with a digital display for the combustion temperature .  A controller with digital display for temperature afterburner .  The electrical panel meets current standard. For removal of ash , a squeegee metal pan with handles The system must be quoted with electric panels We are looking for small incinerators with filter (with least minimum pollution) for burning/combusting 5kg/hr, 10kg/hr, 15 kg/hr, 20kg/hr, 25kg/hr to 50kg/hr and 300kg/hr of SOLID ORGANIC DRY AND WET NON-HAZARDUOUS of any kind (including hospital wastes) per day or per hour. Should it be with no smoke, no fumes, no odour (smell), no dust, no emission of solid particles and with least minimum pollution (within national and international standards). Must be environmentally healthy and acceptable with international standards. Should not be with water scrubbers. Ash contents after burning should be 3-4%. During the manufacturing and after packing, we generates some waste like, chicken bones, some fried products, vegetable waste, biscuits, chocolates (Paste), Plastics, foils, packaging materials, etc. We normally separate the organic waste to make compost. The restout need disposal. At present, we send it to landfill site. But We want to install an incinerator for such waste. The approx quantity is about 4 ton per day.   –  medical waste incinerator solutions and prices for 100 bed / 500 bed / 1000 bed / 3000 bed hospitals.                – Assumption: general hospital beds 50%, operation beds 50% for the 100 bed hospital case, while this ratio is 30-70% for the other cases    –  international standards and waste creations assumptions should apply

SUPPLY, INSTALLATION AND COMMISSIONING OF WASTE INCINERATOR – TECHNICAL SPECIFICATIONS

SUPPLY, INSTALLATION AND COMMISSIONING OF WASTE INCINERATOR – TECHNICAL SPECIFICATIONSThe Waste Incinerator is designed to burn Type IV of pathological waste and infectious, contaminated “red bag,” surgical dressings, plastic test devices and other wastes. General SpecificationsBurner:  2 burners (primary burner and second burner) Fuel: Oil Capacity (Cubic Mtr): 0.65 Ave Capacity: 60 kg per hour Fuel Consumption (ltrs / hr):13 External DimensionsLength (mm): 2300 Width (mm): 1220 Height Incl. Flue (mm) 7000 Door Opening (mm) 610 x 710 610 x 710OperationMin. Operating Temperature: 950 Max. Operating Temperature: 1320 Residency Time in Second Chamber: 5 sec Temperature Monitoring: YES Other clarificationEasy and safe operationLarge counter-balanced fill door with electrical    lockout.Automatic control system provides preset burn times and shut off. Reload light indicates to operator when it is time to recharge. Be required for burnout of final charge.  Low energy consumption levels Programmable digital temperature controls maintain temperature, assuring complete combustion while conserving fuel.  Pressure blower with modulating air control creates turbulence and distributes combustion air to secondary chamber.  Secondary burner with temperature activated modulating control provides fast preheat and   sustains high temperature performance at low energy consumption levels.  Charging rate  Up to 600kgs per ten-hour day of Type IV pathological waste or red bag waste rated at 2200 BTU’s per kg, based on batch loading twice daily.Thermocouples (2 pcs/ each thermocouple assembled on the unit )Thermocouples with pocket (1 pcs/each burner )Nozzles (2 pcs/burner)Nozzle line (1 pc/burner)Glass fibre (2 roll/size)Ignition electrode ( 2 pcs/burner)High tension cable ( 2 pcs/burner)Flame photometer (1 pcs/burner)Burner primary chamber (1 set)Burner secondary chamber (1set)Control panel parts (1 set)Fuse (1 pk from each rating )Solenoid valve (1 pcs/assembled on the unit)Burner oil filter  (10 pcs/burner)Fuel pump (1 pcs/burner)Shaft seal kit (1 set /shaft)Seal plate gasket ( 1 set / plate )Mechanical seal (1 set)Flue gas restricting  ring bricks (1set)Refractory cement (1 pk ) Shaft bearing (1 set)V belts (1 set)

Waste Incinerators

10.A ready built fabricated room shall be supplied for housing the incinerator. The room will be designed in such a way that free space is  available  on all sides and heat radiation  kept at minimum and giving the operators an easy workable environment and ventilation. The materials will be sufficient structural thickness of mild steel angles neatly coated with metal primer and epoxy paint to withstand sea corrosion Smoke less burner unit with all accessories:-Oil flow rate range (100-2500) B/D.-GOR range (200-1000) SCF/D.-API range (14-30).-AIR supply: pressure (50-150) psi, flow rate (350) ft3/min.-Water supply: maximum pressure (300) psi, flow rate water (1800) B/D.-Pilot light: propane gas or gas & oil.-Ignition: supply (400 V, 3 phase +N +T, 50 Hz) & (work at 55 c).-Rotation device: one swivel joint allowing rotation of (75) each side of boom center line.-Connections: (oil 2 in-L.P.) & (air 2 in-L.P. equipped with WECO hammer union fig. 602 – (water 2 in-L.P. equipped union fig. 602). -Pilot gas 1/2 in-L.P. •    Installing a readymade concrete base (Precast) with Height 30 cm above the ground and 20 cm below the surface of the earth. •    The dimensions of the base are increased by (2 meters) from the edge of incinerators •    The rest of the accessories in all the trends even allows the worker directly feeding and maintenance work, cleaning and move easily taking into account the tendencies of the base toward the door for drainage of water.•    The floor coating must be high-quality epoxy paint.•    Install anti-rust and heat Umbrella of brick and steel (pyramid shape) of (5) meters height above the ground which installed with the edge of the concrete base by thick galvanized columns •    This umbrella Cover the site furnace and allow bringing the chimney•   The site is surrounded by an iron fence (sheet metal) 3 meters height from the surface of the earth in order to protect the incinerators from dust storms •    The iron fence must have a 5 meters Width gate •    Automatic anti-rust and heat electrical circuit must be provided •    The furnaces are highly efficient, emissions-free, safe, and environmentally friendly and have capacity of not less than 3,000 kg of materials and the rate of burning at least 400 kg / h•    The method of feeding the furnace through a side slot or from the top and the emission of the smoke is completely prevented.•    a furnace Must have two rooms, one of them is the  main room of not less than the “5” stoves to the process of burning materials and other secondary room of not less “2” stoves to burn resulting gas from the first process as well as the chimney•    The main component of the body of the furnace is stainless steel box, the thickness of not less than 7 mm with a layer of zinc phosphate plated with aluminium reflector to heat•     the thickness of the door of 150 mm and a hardness of not less than 170 kg / m 3 to be burnt, automatic comprehensive remote system.•    Furnaces must be destructive enough to burn and incinerate the material which mentioned previously •   furnaces must have certificates are supported global enterprises and government competent for environmental protection In the country of origin or the General Presidency of Meteorology and Environment Protection in Saudi Arabia•    The oven can work for 24 hours so as to allow for the burning of materials for a period of not less than 12 consecutive hours and the remainder for cooling and provides full fuel tank with a capacity of 1000 L to turn on the oven.•    Must have an automatic ignition and diesel is used•    a furnace has the ability to withstand extreme temperatures up to “130o c And also, it guarantees continuous operation of which can be utilized for 24 hours with the ability to remove residues during the work of the oven, Insulating layer of calcium must be present in the rooms with Thickness not less than 50 mm and a wall thickness of 100 mm •    Isolation of burning room: the space between the walls must be of the “stainless steel”. In addition, burn room must fill with Thermal insulation material.•    Ensure that the combustion of materials emitted in the secondary room should be at least two seconds period and the room is lined with high-density ceramic fibbers•    Incinerators must contain a system for processing (purification) gasses before emission of the smoke.•     Incinerators must have the capacity of self-cooling after the end of the daily operating period.•    Incinerators must have chimney not less than “4 meters” height from the surface of the oven, also, it must be thermally insulated and non-rust able, and must also be removable, installation and tide default.•    Electrical capacity required “220/ 380-volt “60 hertz•    Incinerators must be fitted with a control panel of the electronic keys to monitor all the necessary indicators of activation keys, as well as start-up and switch off so as to be isolated inside a metal box with the presence of the following:Alarm Sensor in the event of (crashes “burner” or purification device or heat leakage       or internal connections and wiring)Monitors for the temperature of the roomsAerosols Filter indicators/ monitorsRoom temperature sensors Indicators for furnaces and index overloadTimer for Extinguish the oven automatically depending on the time required. •    All equipment must be highly resistant to external conditions such as high temperature (50oc) •    All doors must have special lock are not allowed non-persons appointed to work.•    Providing fire extinguisher for each site with a capacity of 10 kg at least9.Metal fuel tank from black steel (capacity not less than 2500 litres) and shall be installed at the incinerator Room. The tank shall be provided with all necessary fittings including fill, vent, drain and overflow line, level indication and access for inspection and maintenance. Level switches shall be provided for the following services.              (a) Low level alarm            (b) High level alarm             (c) Low level start of transfer pump             (d) High level stop of transfer pump

a complete destruction of waste from various hospital services

Medical Waste Incinerator Purpose For a complete destruction of waste from various hospital services by heat treatment of high temperature in accordance with EU standard on emission requirement. -Waste from health care activities -Infections waste, laboratory cultures, waste form operation room isolations material in contact with infected patients, waste potentially being infected by pathogenic agents.  -Pathological waste, human fragments, blood, fetus, all body fluids, human tissues. -Sculpts, needles, infusion sets, blades, glass -Pharmaceutical waste.  -Chemical waste laboratory reagents, disinfectants -Expired drugs.  -Low radiation radioactive element. Medical waste incinerator: – Ecological Requirement – No odor -No fume -Definitive treatment of waste Medical waste incinerator: – Manufacturing Standards  -UL,CE, ASME, ISA EURO emission standard  1.Medical waste incinerator  Construction – CS plate shells, FB reinforcement, cast refractory linings,                          Insulation and 14 gage aluminum jacket.  Type of fuel – Oil fired (Diesel) Burning Capacity – 250kg/hr and moisture up to 80%. Duration -8-16/Continuous   Average fuel consumption – Very little as much as possible Control Type – PLC based operation Operating Temperature – Primary chamber 800oc ± 50                                      – Secondary Chamber 1050oc ± 50 Size of incinerator – Not more than 15mx7.20m Chimney – Ø630x25meter height  and 7mm thick CS. Combustion efficiency- 99% Mode of waste handling- Semi-automatic via ram loader. Mode of ash handling – Semi-automatic via grate and ash trolley. Pollution control equipment- Dry settlement zone Doors- 1-waste charging door in primary chamber             1-clinker door in primary chamber             1-ash trolley access door in primary chamber             1-clean out door in secondary chamber Burner – 2- ignition burner in primary chamber                2- after burner in secondary chamber.             Type- package mono block-fully automatic Type of burner operation- modulation control Forced draught fan- 1-primary air fan …